BWSSB is currently implementing many projects in many fronts to cater to the growing demands of the Bangalore Metropolitan Area. The Following table provides the link to details on various projects that are being implemented currently.

CWSS Stage-IV Phase-2

DETAILS OF ON-GOING WORKS UNDER CHIEF ENGINEER (PROJECT) ZONE.

 CONSTRUCTION OF GLRs

 

The Government of Karnataka in the current financial year has earmarked Rs.700.00 Crores to BDA for taking up infrastructure development works in the newly added areas of BBMP. Out of this 700 crores, Rs.100.00 Crores is set aside to BWSSB for improving water supply facilities to these areas vide G.O.No.NAE/153 MNI 2008 dt:30.09.2008. Under this by utilizing the Rs.100.00 crores budget grant from BDA, it was proposed to construct GLRs at  following 10 locations around Bangalore city.

 

Sl no. Name of CMC Location Extent of land in Acres GLR Capacity in ML Land Ownership.
1 Bommanahalli Hongasandra 3.0 9.0 BBMP
2 K.R. Puram B. Narayana Bande 10 22.5 BBMP
3 Byatarayanapura Coffee Board Lay out 2 9.0 BBMP
4 Dasarahalli MEI Lay out near existing OHT 2 5.0 BBMP
5 Rajarajeshwarinagara Sy.No.125&126, Rajajinagar HBCS, Srigandadakaval 1.40 5.0 BBMP
6 Dasarahalli Nandini Lay out OHT - 9.0 BBMP
7 Dasarahalli Syndicate Bank HBCS, Herohalli, Yashwanthpura Hobli 2 9.0 BBMP
8 Rajarajeshwarinagara 3rd Block,2nd stage, Nagarabavi BDA Lay out( Near Chowdeshwari Temple). 4 9.0 BBMP
9 Mahadevapura Sy.No.17/2 &18/2, Channasandra Village, Bangalore East Taluk 2 9.0 BBMP
10 Core Area Kunthigrama hill, Geddalahalli, Ward No.96,Hebbal. 75x45mts 5.0 BBMP

 

The Board in its meeting held on 05.09.2008 has accorded approval for taking up the above works.

Among the above 10 works, following works are taken up under Chief Engineer (Project) zone and are under progress.

  1. Work of Construction of  5 ML Capacity  RCC Circular Ground level Reservoir at 3rd Block, 2nd Stage, Nagarabhavi near Chowdeswari Temple.
  2. Work of Construction of  7.5 ML Capacity  RCC Ground Level Reservoir at Srigandada kaval RR Nagar CMC.
  3. Work of Construction of 9 ML Capacity  RCC  Ground Level Reservoir at MEI Layout in Dasarahalli BBMP zone.
  4. Work of Construction of 9 ML Capacity  RCC  Circular  Ground Level Reservoir near Nandini Layout OHT in Dasarahalli BBMP zone.
  5. Work of Construction of 9 ML Capacity  RCC  Ground Level Reservoir at Coffee Board Layout in Byatarayanpura BBMP zone.
  6. Work of Construction of 7.5 ML Capacity  RCC Ground Level Reservoir in Syndicate Bank HBCS at Herohalli

 Work taken up under Board Funds

 Work of Construction of 7.50 ML Capacity  RCC  Ground Level Reservoir at Ramamurthy nagar, Opposite to Uttam Sagar hotel, Krishnarajapuram, Bangalore – 560016.

 

DC WORK OF BDA

Work of  Providing Water Supply and UGD facilities to Sir.M. Vishweshwaraiah layout 1 to 9 Block.

 

BDA has formed SMV Layout at Kengeri during the year 2003-04. The layout Comprises of 9 blocks with a proposal to form 21000 sites.

Following works are taken up under DC works of BDA.

 

  1. Work of Providing Water Supply distribution Network  to S.M.V Layout BlockNo.1 to 6 of BDA.

 

  1. Work of Providing UGD Lateral Network to Sir.M.Vishweshwaraiah Layout BlockNo.1 to 6 of BDA.

 

  1. Work of Providing Water Supply Feeder main Facilities to Proposed GLR’s at 8th, 6th and 1st Block of  SMV Layout tapping from 24” dia transmission main from T.G.Halli at Anjananagara, Bangalore.
  2. Work of Providing Water supply distribution network and UGD Disposal line in 7th to 9th Blocks of SMV Layou

 GBWASP WORKS

BACKGROUND:

There were eight Urban Local Bodies (ULBs) around Bangalore, namely, Byatarayanapura, Bommanahalli, Dasarahalli, Kengeri, K.R.Puram, Mahadevapura, Rajarajeshwarinagara and Yelahanka, which have now been merged under the Bruhat Bangalore Mahanagara Paalike (BBMP).  Each of these have been on the fast track to growth and development. While the 2001 census estimated the population in these areas to be 12 lakhs, studies showed that these areas lacked even the basic infrastructural services such as a piped water system and an underground drainage system.  Projections showed that by 2020, the population in these eight erstwhile ULBs would touch the 30 lakh mark, which is an increase of 18 lakhs in just two decades.

INTRODUCTION TO GBWASP:

The Greater Bangalore Water and Sanitation Project (GBWASP), Implemented by the Bangalore Water Supply and Sewerage Board (BWSSB), has two components; a Water Supply component and an Underground Drainage (UGD) component.

The Water supply component has a very creative structure for financing.  The USAID has an important role in the design of the structure.  The UGD component has been funded by the World Bank under the Karnataka Municipal Reforms Project.

Government in its order UDD. 27 MNI 2000 Bangalore 26.12.2003 had accorded approval for Implementation of water supply and sanitation for 7 CMC & 1 TMC falling within BMA at a total cost of 658.64 Crores as detailed below. The water supply component is enhanced from Rs 340.55 Crores to Rs 536.98 Crores. Objective of the project is to provide network to an area of 250.00 Sq Km covering 8 ULBs.

 Details of Funding of GBWASP

Sl No

FUNDS

As per GO UDD 27 MNI

1st Revision

2nd Revision

1 Govt Grant

74.28

74.28

108.95

2 BCC

119.45

119.45

328.03

3 Megacity Loans

46.82

153.33

-

4 Market Borrowings

100.00

100.00

100.00

Gap Fund

340.55

447.00

536.98

 Following Works are taken up:

Work of Providing Water Supply Facilities to Byatarayanpura CMC under GBWASP.

Work of Providing Water Supply Facilities to Yelahanka CMC under GBWASP.

Work of Providing Water Supply Facilities to K.R.Puram CMC under GBWASP.

Work of Providing Water Supply Facilities to Mahadevapra CMC under GBWASP.

Work of Providing Water Supply Facilities to Dasarahalli  CMC under GBWASP.

Work of Providing Water Supply Facilities to R.R.Nagar CMC under GBWASP

Work of Providing Water Supply Facilities to Bommanahalli CMC under GBWASP.

Work of Providing Water Supply Facilities to Kengeri TMC under GBWASP.

 

Karnataka Municipal Reform Project (KMRP)

 Government of Karnataka has approved the Karnataka Municipal Reform Project vide order no. UDD56 PRJ 2005 Dated 13-9-2005 for providing infrastructure and enhancing the capacity of the ULBs of Karnataka State.  Under this project, providing under ground drainage facilities to the areas of the erstwhile 8 ULBs of BBMP has been taken up.

KMRP has been taken under financial assistance of the World Bank with a loan amounting to US$216 million [Rs. 950.40 Crore], under this Bangalore UGD Component is US $ 137.60 million [Rs. 605.44 Crore].  The work includes providing UGD facilities, restoring the road damaged during implementation period, Institutional support for capacity building.  There has been a separate amount of US$ 6.8 million [Rs. 29.92 Crore] for providing sanitation facilities to the urban poor.  Loan agreement was signed on 2nd May 2006.

Project Monitoring Consultant, a JV firm, M/s DHV BV, the Netherlands and M/s DHV India Ltd, was appointed on 14th February, 2006 for preparation of DPR, Bid documents and assist in the procuring and implementation of the project at a total cost of Rs. 6.60 Crore.

DPR for each ULB was prepared and total cost of the project was estimated at Rs. 938.00 Crores.  The project was dovetailed with JnNURM funding to meet the additional funding.  JnNURM approved the project with an assistance of Rs. 383.26 Crore.

The works were awarded in 24 Packages to different ULBS and the works are under progress.